Elevated Work Platforms (EWP) Licensing Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Enhance your skills with the Elevated Work Platforms Licensing Exam. Prepare with interactive quizzes and comprehensive explanations. Ensure success in your EWP licensing test!

Practice this question and more.


How many post-operational checks should be performed after shutting down the EWP?

  1. More than four

  2. At least two

  3. Six

  4. Only one

The correct answer is: Six

Performing post-operational checks after shutting down an Elevated Work Platform (EWP) is crucial for ensuring safety and preparing the equipment for its next use. The practice of conducting six post-operational checks is established to ensure thoroughness in inspecting the EWP after operation. These checks typically include examining the working condition of the platform, ensuring that all controls are in a neutral position, verifying that safety devices are functioning correctly, confirming that the platform is properly stowed, inspecting the area for hazards, and reviewing operational documentation or logs. By performing these checks, operators can identify any issues that may need repair or attention before the equipment is used again, thus contributing to the safety of future operations. This systematic approach helps prevent accidents and equipment failures that could arise from neglecting even minor concerns noticed at shutdown.